Betonyp®
4.5 FINISHING,
PAINTING, FLOOR COVERINGS
When you finish building BETONYP boards,
shall be assessed the main characteristics of the table:
- Thanks to its high content of cement,
the table shows reactions of alkalinity (similar to cement)
- The table surface is smooth and quite absorbent
- The moisture content of the table must not exceed 14%
Should be used any material resistant
alkalinity or alkaline a first layer of stain to finish building the
tables BETONYP.
The purpose of applying a primed (primer):
- Reduce surface alkalinity
- Make it absorbent and uniform
- Decrease the absorption of moisture
The so-called "primer in depth" strong alkalinity (which do not show on
the surface saponification) is used for that purpose.
Before application of finish materials is highly recommended to seek
information directly to suppliers.
Repair of minor damage of the table:
Prepare the damaged part with other parts of the surface, then fill the
hole using putty DEKO. Once dry, remove the portion of the excess glue and align with the other
solid parts of the surface by the method of grinding.
To paint the boards BETONYP building is
recommended to use advanced coating through the various manufacturing
companies as paint and varnishes
4.6 WALLPAPERING
Wallpapering is a general method for finishing the
surface of the bedrooms.
Preparation of the surface finish of fittings from cracks or repair of
certain defects of the surface by filling with plaster (Breplasta). To compensate for slight movements of the structure, the foam is
positioned elastic panel or plaster under the wallpaper. This layer makes the surface slippery
ready to prepare the final surface
- Location wallpaper with polystyrene substrate: the wallpaper is
available in the form of panels and depending on size. Ensure that vertical stripes are well combined. The reconciliation of margin to margin should not match the siding
panel and preferably free of cracks
- Initially, to uniformly apply the
adhesive on the wall surface to be positioned (by means of brush and
comb distribution) then based on the wallpaper. The walls are ready to dry at least 10 minutes. An area of 3-4 m (q) should be hung simultaneously. The substrate of wallpaper can be placed on the wall by TEDDY
rollers so that the air enclosed between the layers squeeze, moving
the roller in one direction.
- Location of the wallpaper with gypsum boards: plasterboard is
available in cake form, and should be cut precisely to measure the
size to be made. The panel must be fixed with screws. Starting from the center and continuing down. The panel must be fixed in its limits and center line in the same
way as the panels of beading, making sure that the junction of the
link and the plasterboard are in a balanced position. You must use a thread shavings minimum of 35 mm in length. The distance must be fixed up to 200 mm and a minimum of 15 mm from
the edge of the table. The hole formed in the setting of nails should be covered with
gypsum. The position of the head of the nails should be masked with the
plaster cast. The technology of the position of wallpaper used for areas just
mentioned, is similar to that applied in conventional walls. You can apply a light wallpaper with superimposed fitting directly
to the table of polystyrene. Special wallpapers and wall coverings can be attached with tape to
water leakage. Be careful at the corners of the walls when you move the wallpaper
vertically. Do not carry on a continuous wallpaper near the walls. Here the wallpaper must be united, leaving a slight overlap and
joining just one layer. It is recommended to complete the wallpaper before placing the tapes
covering the tables and marginal, despite facilitating the
connection of the horizontal edges of the margins and those of the
rooms and windows.
WARNING: The adhesive tape, putty and paint used for PS polystyrene plates may
not contain organic solvents.
4.7 COATINGS FOR "ROOMS TO
WET"
4.7.1 PVC coating systems
The coating systems are suitable for making connections, resilient
quality "rooms to wet" toilets, bathrooms, toilets, gyms, swimming pools,
shower rooms, and areas above the kitchen work. Local spa, beauty cabins etc..
· Surface Preparation:
The variability or misalignment of the base plates in the floor under
the floor should be eliminated. The basic materials used for floor finishing are: limes polymer, a set
of self-smoothing floor also called "leveling."
· The
defects of the external panels with coating materials can be repaired
with mastic DEKO.
· Initially,
you must finish flooring. The material for the flooring free of holes must be welded together
fittings. Pay attention to the welding of the corners.
· Wall cladding-free holes must be united
through the cut, so that the coating material 5 cm folded to overlap the
edges of the floor covering to form a container. Therefore, make sure that no infiltration of water entering the building
structure of the panel. The union of the PVC coating is recommended and should be done by
specialists.
4.72 Bonding tiles and wall
tiles
The tiles form a hard layer on the surface of the wall (or floor), so,
you must observe the following instructions for the position:
- It is recommended to design the
structure so that supports the solid load (structure of solid
construction, and fasten the plates). The movement of the structure that supports the load can cause split
or broken tiles.
- Tiles must be applied in a robust,
allowing a minimum clearance of 3 mm between the drain and tile. Similarly, we require a minimum clearance of 3 mm between the drain
and the corners.
- In the corner fittings may be used only an elastic material and
continuing to fill the holes (Silicone or acrylic). Take into consideration that when you use silicone to fill the holes,
then can not be stained or painted. Therefore using the silicone, you must apply a colored silicone. The dough of acrylic can be painted later.
- Especially for larger walls must be
positioned an expansion joint of elastic material between the plates
BETONYP construction and tile, to form a layer that slides. This layer can be a table of polystyrene or plaster placed on a
finished surface according to the guidelines (union with the PS
board and fixing screws to the chalk board).
The position of the tiles can be made on these surfaces. When you combine the tiles, you must follow the instructions of the
adhesive suppliers.
If the flooring of the rooms exposed to humid
conditions with the roof built ceramics - especially if the floor
BETONYP is positioned between the ground floor and mezzanine, is likely
to test leakage of rainwater.
This insulating material can be solidified with the waterproofing (BITUGEL)
and combined (tables + bitumen bitumen). The insulating material must be placed by folding the
side wall of at least a minimum of 10 cm.
BITUGEL is used to bond the ceramic coating and insulating material. In the appropriate angles, it is recommended to use the elastic to cover
the holes. |
The facility unique in
Europe with proprietary technology for
the production of Cement Wood Betonyp ®
The
timber plants for reforestation
programmed
before processing into chips
Wood chips prior to production of Betonyp®
Portland
Cement storage silos
Loading operation of the Portland
Cement
Part of processing
The pressing of the panels on the
skids
Cutting plates also customized
Customizing profile graft
Calibrated and sanded panels
Packing of product
Protected slab ready for shipment
|